Project Items Completed

Energy Upgrades:

  •  Roof reconstruction and repairs at both Middle School and High School
  •  Boiler replacement

 

 Health and Safety Improvements:

  •  Installed mandated domestic water chlorination and filtration system
  •  Replaced air intake louvers at 2nd floor
  • Building envelope masonry restoration
  • Ventilation improvement at the MS/HS kitchen and cafeteria
  • Water pump replacement
  • Domestic water piping replacements
  • Replace fire alarm devices and update system programming
  • Install American Disability Act (ADA) push button door access

 

 

Outstanding Project Items

 The last phase of the project is scheduled to begin Summer 2016 with replacement of heating and ventilation units in the Middle School.